Green Pool Cleanup 

Based on 10,000 gallons

(37, 855 Litres)

Day 1

  1. Clean out with a net or vacuum as much debris as possible 
  2. Brush the pool thoroughly 
  3. Lower pH to 7.2
  4. Raise chlorine up to 10-15 ppm using non stabilized chlorine
  5. Purge with PR-10,000 phosphate remover 1 qt per 10,000 gallons around the perimeter of pool 
  6. Allow circulation for ten minutes 
  7. Shut off circulation 

Day 2

  1. Thoroughly vacuum the pool (to waste) and skim off any leaves or debris 
  2. Test the free chlorine level
  3. Turn on circulation system and begin filtering 
  4. Purge with CV-600/700 enzymes 1 qt per 10,000 gallons around the perimeter of pool 
  5. Adjust the ph/alkalinity to be in LSI range 

Follow Up 

  1. Perform necessary micro vacuum brushes 
  2. Backwash system as needed 
  3. Clean filter
  4. Make any necessary chemical adjustments 

Weekly and Monthly Maintenance

  1. Use enzymes or CE-Clarifier on a weekly basis 
  2. Use PR-10,000 as needed to keep phosphate levels below 500 ppb 



 

More Questions?

866-763-4269